On Sat, 20 Nov 2004 14:33:04 +0000, David G <notreallyhere@sure>
wrote:
>I understood that the
>change to POTS and removal of the highway box should all be done at the
>same time with say a maximum downtime of 1 hour. Is this correct?
a managed *conversion* involves the BT engineer removing the highway
signal off the line and establishing the ADSL signal works, otherwise
they revert to Highway. An hour would sound reasonable, could be
longer if it doesn't work first time.
I'm not clear from the question if you are still have a managed
conversion booked, if not the Highway to POTS conversion wil be one
even and the ADSL enabled later.
Phil
--
spamcop.net address commissioned 18/06/04
Come on down !
|